Prepare people, data and decisions before development
When departments interpret requirements differently, data is scattered and nobody can approve decisions, the delivered application may not match how the company works. Before development, identify the people responsible, priorities and available materials.
Give one person authority to approve the scope
Choose someone on the client side who can approve the scope and priorities, answer the developer’s questions and resolve conflicting requests from different departments. Make clear which decisions they can take independently and when they need to consult others. Record the decisions so that everyone works from the same requirements.
Describe a task and the information it needs
Describe where a request arrives, who checks it, what data they add, when the status changes and how exceptions are handled. If you have screen sketches, include the rules each view must follow.
- regular work scenarios
- exceptions currently handled by phone or spreadsheet
- the owner of every stage
- inputs, outcome and expected time
Example: preparing a job-handling process
This is a hypothetical organisational example, not a client delivery. A company receives jobs by email and assigns them to a field team once the date is agreed. Before development starts, the process owner identifies who confirms the date, where the job address comes from and who decides what happens when no team is available. Acceptance scenarios cover an ordinary job and a cancelled appointment.
That description identifies decision owners, required data and cases to check. The developer does not have to infer the rules from a list of screens.
Define the first version through an outcome
An MVP is not an unfinished system. It is the smallest safe version that completes one valuable process end to end. A feature belongs in the first release if the outcome, an obligation or evidence for the next decision cannot exist without it.
A “must have” list containing everything is not prioritisation. Separate launch essentials, post-launch needs and ideas to validate. Record the expected effect beside every feature.
Prepare data for a trial migration
Identify data sources, owners, quality and deletion rules early. Duplicate customers, missing identifiers and three date formats will not repair themselves during import. Run a trial migration while it can still change the plan.
An integration needs owners on both sides
“Connect to ERP” is not a requirement. The team needs API documentation, a sandbox, limits, authentication, contacts and expected behaviour during an outage. Retries, monitoring and reconciliation belong in the design.
Security and access before launch
- roles and permitted operations
- individual accounts rather than shared credentials
- access granting and removal procedure
- encryption and retention needs
- alert ownership, backups and restoration plan
Acceptance starts before the last day
Key users should see working increments regularly. Acceptance means completing realistic scenarios on representative data, not clicking through menus. Each stage ends with a decision: accept, correct or deliberately move outside scope.
What to bring to the first workshop
- one measurable delivery goal
- a product owner and key users
- the current process including exceptions
- a non-sensitive sample of data
- integrations and technical contacts
- time, budget and regulatory constraints
Next step
This checklist structures the first conversation but does not replace an analysis of the actual process, data and integrations. If you can describe the problem and name the decision owner, you can start a delivery-scope conversation without a finished multi-page specification.
If you are still collecting the first facts about a new system, use the Project Brief Builder. When stage boundaries, roles and dependencies need to be resolved, we can separately agree business analysis and MVP planning. An initial brief and preparation for delivery serve different purposes.